How to Evaluate and Choose a Raised Floor Manufacturer in China
For international contractors and data center procurement teams, the most useful supplier comparison starts with the exact floor assembly. Use these six checks to compare a supplier’s production, test evidence and delivery scope before placing an order.

Plan your specification
Take the procurement checklist into supplier discussions and use the specification tables to check the quoted assembly.
1. Verify the factory and the process
Ask for the production location, history and the scope of work performed at the facility. Review the actual stamping, shell welding and infill operations for the quoted model. Identify which steps are performed in-house and which are subcontracted. Ask how materials and production batches are traced.
2. Match each test report to the proposed assembly
Check the lab, report number, specimen, panel finish, pedestal and stringer arrangement and test method. Treat CISCA load procedures and ASTM E84 surface-burning tests as separate evidence. For E84, read the specimen and classification scope. Where wheel traffic matters, request a rolling-load report that states wheel type, load and number of passes.
3. Check load ratings against the panel and support details
Request the top and bottom steel thickness, shell geometry, infill, edge detail and support layout for the quoted model. Compare concentrated, uniform, ultimate and rolling loads separately using equivalent test methods and conditions. Check deflection and permanent set limits and account for equipment moves and finished floor height. Steel thickness is one input to assembly performance.
4. Verify the opening pattern and airflow at design pressure
Ask for the drawing, open-area calculation and tolerances for the perforation pattern. For a ventilated floor, ask how open area is checked in production and request airflow at the design pressure difference. Check the grille load rating, the support arrangement and which openings remain clear after installation.
5. Define OEM or ODM scope before approving a sample
List the requested finish, edge, panel interface, cut-outs and packaging. Agree who approves drawings and samples and which changes need retesting. Specify what the CAD package will include, such as grid layout, perimeter details and service openings, and confirm who is responsible for final coordination.
6. Compare packing and full-container loading plans
Ask for pallet dimensions, gross weights, wrapping, restraint and the proposed container loading plan. Confirm the shipping term, destination, spare panels, batch labels and document responsibilities. Compare the same scope for all quotations, including understructure and handling.
Procurement checklist before you place an order
- Factory address at city or province level, process responsibility and recent evidence for the quoted line.
- Model and finish schedule, panel and support drawings, steel thickness, finished floor height and installation details.
- Test report numbers, actual assembly, methods, loads, deflection limits, wheel conditions and fire or ESD acceptance criteria.
- Airflow panel drawing, opening tolerance and airflow at design pressure where the cooling design requires ventilation.
- Approved samples or drawings, agreed customization, quantities, spares and shipment plan.
Panelway capability and evidence
| Check | Panelway reference | What to confirm for your order |
|---|---|---|
| Factory history and location | The factory has manufactured raised floors since 1989 in Shandong, China. Factory production | Confirm the production steps for the proposed line and model. |
| Test evidence | SGS sample reports and other model-specific test summaries | Match each report to the proposed configuration and project standard. |
| Model and load selection | ST model dimensions and CAD load specifications | Confirm the steel thickness, support arrangement and applicable load report. |
| Ventilation | Airflow panels with 20%, 45%, 60% and 70% open-area options | Specify design airflow, pressure difference, loading and dimensional tolerances. |
| OEM and CAD scope | Discuss customization and CAD layout support | Agree the deliverables and technical approvals in the quotation. |
| Export experience | Exported to 40+ countries and regions. Export packing and container loading | Confirm pallet and container requirements for the destination. |
Frequently asked questions
What should I ask a raised floor manufacturer for before ordering?
Ask for the exact panel and support drawings, the test reports for the proposed assembly, a finish sample or approved drawing, and a packing plan for the order.
How do I verify a raised floor test report?
Match the report number, lab, standard, specimen, support configuration and test conditions to your specification. Ask for the report for the proposed assembly when a summary lists only a sample result.
Is a higher open-area percentage enough to select an airflow panel?
Use the open-area calculation with airflow at the design pressure difference and the load rating for the panel and support. Verify both with the supplier before selection.
What should a quotation request include?
Include the floor area, finished floor height, finish, loading, test standards, destination and schedule. For underfloor cooling, add the airflow and design pressure difference.
Discuss your floor specification
Share your floor schedule, required test standards and delivery destination. We can review the panel, supports, report scope and packing together.
Request a Quote